Skip to content

Resource / planning

Write the plan before the comparison.

A compact measurement plan makes the assumptions visible before a team interprets a result.

Define the question

What decision will the evidence support?

Describe the operation and the decision in plain language. For example, identify a process whose idle consumption needs investigation. This is a question to examine, not a promised saving.

  • Boundary: site, process, equipment and exclusions.
  • Period: baseline and intended review period.
  • Output: the useful production measure and its unit.
  • Conditions: product mix, operating hours and other material variables.

Choose the method

Record the denominator and assumptions.

Specify how readings will be aligned, how gaps will be treated and which conditions must be comparable. If a carbon calculation is needed, record the applicable factor source, date, unit and boundary rather than inserting an assumed universal factor.

Name the owner of the measurement plan and the person responsible for reviewing the comparison. Record any change to the method as a new revision.

Keep a working record

Use a template that can be explained.

Download the measurement plan

CSV · editable in a spreadsheet · no registration required

The CSV contains planning prompts only. Add the method appropriate to your site; it is not a substitute for a project-specific technical or assurance requirement.

Your next step

Start with one operational question.

Tell us what you want to measure, what data you have and where improvement matters most.